Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2007 |
Principal Product | Sodium Bicarbonate, Cat Litter, Rumen Bypass Fat |
NAICS | 325180 - Other Basic Inorganic Chemical Manufacturing |
SIC | 2812 - Alkalies And Chlorine |
Sales | $10,000,000-$50,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 421,562 Tons |
Production Hrs. Annual | 8,736 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $681,359 | 27,936,000 | kWh | $0.02 |
Electricity Demand | $562,175 | 41,367 | kW-months/year | $13.59 |
Electricity Fees | $1,241 | - | $ | - |
Natural Gas | $1,820,821 | 216,093 | MMBtu | $8.43 |
TOTAL ENERGY COSTS | $3,065,596 | |||
RECOMMENDED SAVINGS* | $503,630 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $134,342 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $366,043 Cost: $516,500 |
$(-13,641) | (-559,275) | $(-30,402) | (-2,237) | $410,086 | 48,646 |
$(-13,641) (-559,275) kWh |
$(-30,402) (-2,237) kW-months/year |
$410,086 48,646 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $56,464 Cost: $1,000 |
- | - | - | - | $56,464 | 6,698 |
- - kWh |
- - kW-months/year |
$56,464 6,698 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $45,783 Cost: $500 |
- | - | - | - | $45,783 | 5,431 |
- - kWh |
- - kW-months/year |
$45,783 5,431 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $26,141 Cost: $12,385 |
$(-1,589) | 65,144 | $(-1,210) | (-89) | $28,940 | 3,433 |
$(-1,589) 65,144 kWh |
$(-1,210) (-89) kW-months/year |
$28,940 3,433 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $5,954 Cost: $638 |
$3,372 | 138,271 | $2,582 | 190 | - | - |
$3,372 138,271 kWh |
$2,582 190 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $2,065 Cost: $10,000 |
- | - | - | - | $2,065 | 245 |
- - kWh |
- - kW-months/year |
$2,065 245 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,180 Cost: $1,540 |
- | - | - | - | $1,180 | 140 |
- - kWh |
- - kW-months/year |
$1,180 140 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $503,630 Cost: $542,563 |
$(-11,858) | (-355,860) | $(-29,030) | (-2,136) | $544,518 | 64,593 | $(-11,858) (-355,860) kWh |
$(-29,030) (-2,136) kW-months/year |
$544,518 64,593 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $134,342 Cost: $14,523 |
$1,783 | 203,415 | $1,372 | 101 | $131,187 | 15,562 | $1,783 203,415 kWh |
$1,372 101 kW-months/year |
$131,187 15,562 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |