IAC logo
IAC Assessment: UM0382
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0382
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2011
Principal Product Work Surfaces
NAICS 337127 - Institutional Furniture Manufacturing
SIC 2599 - Furniture And Fixtures, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 125,000
Annual Production 1 Units
Production Hrs. Annual 6,120
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,562 4,440,481 kWh $0.05
Electricity Demand $122,962 7,782 kW-months/year $15.80
Natural Gas $350,932 42,000 MMBtu $8.36
TOTAL ENERGY COSTS $701,456
RECOMMENDED SAVINGS* $36,229 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$252
Cost:
$1,000
$252 4,916 - - - - - - $252
4,916
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$87
Cost:
$10
$87 1,700 - - - - - - $87
1,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,453
Cost:
$1,000
- - - - $3,453 413 - - -
-
kWh
-
-
kW-months/year
$3,453
413
MMBtu
-
-
$
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$2,843
Cost:
$2,200
- - - - $2,843 340 - - -
-
kWh
-
-
kW-months/year
$2,843
340
MMBtu
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,115
Cost:
$2,800
- - - - $2,115 253 - - -
-
kWh
-
-
kW-months/year
$2,115
253
MMBtu
-
-
$
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$17,682
Cost:
$21,309
- - - - $17,682 2,115 - - -
-
kWh
-
-
kW-months/year
$17,682
2,115
MMBtu
-
-
$
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$9,797
Cost:
$31,000
$4,548 88,740 $2,749 174 - - $2,500 - $4,548
88,740
kWh
$2,749
174
kW-months/year
-
-
MMBtu
$2,500
-
$
TOTAL RECOMMENDED Savings:
$36,229
Cost:
$59,319
$4,887 95,356 $2,749 174 $26,093 3,121 $2,500 - $4,887
95,356
kWh
$2,749
174
kW-months/year
$26,093
3,121
MMBtu
$2,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes