IAC logo
IAC Assessment: UM0409
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0409
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2012
Principal Product Laundry
NAICS 812332 - Industrial Launderers
SIC 7218 - Industrial Launderers
Sales $5,000,000-$10,000,000
# of Employees 87
Plant Area (Sq.Ft.) 23,000
Annual Production 13,000,000 Pounds
Production Hrs. Annual 5,148
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,549 816,640 kWh $0.06
Natural Gas $143,750 31,250 MMBtu $4.60
TOTAL ENERGY COSTS $190,299
RECOMMENDED SAVINGS* $22,924 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,058
Cost:
$1,200
$1,058 18,562 - - $1,058
18,562
kWh
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,590
Cost:
$10,000
- - $7,590 1,650 -
-
kWh
$7,590
1,650
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,300
Cost:
$5,000
- - $7,300 1,587 -
-
kWh
$7,300
1,587
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,324
Cost:
$3,000
- - $4,324 740 -
-
kWh
$4,324
740
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,652
Cost:
$6,000
- - $2,652 546 -
-
kWh
$2,652
546
MMBtu
TOTAL RECOMMENDED Savings:
$22,924
Cost:
$25,200
$1,058 18,562 $21,866 4,523 $1,058
18,562
kWh
$21,866
4,523
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas