IAC logo
IAC Assessment: UM0416
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0416
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2012
Principal Product Bituminous Hot Mix Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $5,000,000-$10,000,000
# of Employees 10
Plant Area (Sq.Ft.) 100,000
Annual Production 100,000 Units
Production Hrs. Annual 1,705
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,503 524,000 kWh $0.10
Natural Gas $286,468 54,774 MMBtu $5.23
TOTAL ENERGY COSTS $336,971
RECOMMENDED SAVINGS* $847 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $222
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$625
Cost:
$200
$625 6,480 $625
6,480
kWh
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$222
Cost:
$450
$222 2,302 $222
2,302
kWh
TOTAL RECOMMENDED Savings:
$847
Cost:
$650
$847 8,782 $847
8,782
kWh
TOTAL IMPLEMENTED Savings:
$222
Cost:
$450
$222 2,302 $222
2,302
kWh