IAC logo
IAC Assessment: UM0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2015
Principal Product coated can end stock, metal
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3355 - Aluminum Rolling And Drawing, Nec
Sales $100,000,000-$500,000,000
# of Employees 90
Plant Area (Sq.Ft.) 150,000
Annual Production 150,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $533,789 9,406,700 kWh $0.06
Natural Gas $947,744 187,058 MMBtu $5.07
TOTAL ENERGY COSTS $1,481,533
RECOMMENDED SAVINGS* $22,695 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,130
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,028
Cost:
$2,000
$1,028 18,044 - - $1,028
18,044
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,291
Cost:
$14,700
$4,291 75,276 - - $4,291
75,276
kWh
-
-
MMBtu
03: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES Savings:
$2,130
Cost:
$1,710
$2,130 37,384 - - $2,130
37,384
kWh
-
-
MMBtu
04: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$13,892
Cost:
$4,500
- - $13,892 2,740 -
-
kWh
$13,892
2,740
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,354
Cost:
$1,000
- - $1,354 267 -
-
kWh
$1,354
267
MMBtu
TOTAL RECOMMENDED Savings:
$22,695
Cost:
$23,910
$7,449 130,704 $15,246 3,007 $7,449
130,704
kWh
$15,246
3,007
MMBtu
TOTAL IMPLEMENTED Savings:
$2,130
Cost:
$1,710
$2,130 37,384 - - $2,130
37,384
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas