IAC Center | University of Michigan |
---|---|
Assessment Year | 2015 |
Principal Product | coated can end stock, metal |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3355 - Aluminum Rolling And Drawing, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 150,000,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $533,789 | 9,406,700 | kWh | $0.06 |
Natural Gas | $947,744 | 187,058 | MMBtu | $5.07 |
TOTAL ENERGY COSTS | $1,481,533 | |||
RECOMMENDED SAVINGS* | $22,695 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,130 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,028 Cost: $2,000 |
$1,028 | 18,044 | - | - |
$1,028 18,044 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,291 Cost: $14,700 |
$4,291 | 75,276 | - | - |
$4,291 75,276 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES |
Savings: $2,130 Cost: $1,710 |
$2,130 | 37,384 | - | - |
$2,130 37,384 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM |
Savings: $13,892 Cost: $4,500 |
- | - | $13,892 | 2,740 |
- - kWh |
$13,892 2,740 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,354 Cost: $1,000 |
- | - | $1,354 | 267 |
- - kWh |
$1,354 267 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,695 Cost: $23,910 |
$7,449 | 130,704 | $15,246 | 3,007 | $7,449 130,704 kWh |
$15,246 3,007 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,130 Cost: $1,710 |
$2,130 | 37,384 | - | - | $2,130 37,384 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |