IAC logo
IAC Assessment: UM0455
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0455
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2015
Principal Product Pharmaceutical Excipients
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 70,000
Annual Production 5,000 Tons
Production Hrs. Annual 8,700
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $426,830 3,991,140 kWh $0.11
Electricity Demand $103,452 7,858 kW-months/year $13.17
Natural Gas $160,734 22,456 MMBtu $7.16
TOTAL ENERGY COSTS $691,016
RECOMMENDED SAVINGS* $34,648 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,510
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,635
Cost:
$2,000
$1,635 13,466 - - - - $1,635
13,466
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$8,778
Cost:
-
$8,778 82,040 - - - - $8,778
82,040
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,898
Cost:
$500
$3,898 29,530 - - - - $3,898
29,530
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$6,274
Cost:
$7,300
$5,261 49,166 $1,013 77 - - $5,261
49,166
kWh
$1,013
77
kW-months/year
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,338
Cost:
$2,500
- - - - $2,338 334 -
-
kWh
-
-
kW-months/year
$2,338
334
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$11,725
Cost:
$25,000
- - - - $11,725 1,675 -
-
kWh
-
-
kW-months/year
$11,725
1,675
MMBtu
TOTAL RECOMMENDED Savings:
$34,648
Cost:
$37,300
$19,572 174,202 $1,013 77 $14,063 2,009 $19,572
174,202
kWh
$1,013
77
kW-months/year
$14,063
2,009
MMBtu
TOTAL IMPLEMENTED Savings:
$12,510
Cost:
$10,300
$9,159 78,696 $1,013 77 $2,338 334 $9,159
78,696
kWh
$1,013
77
kW-months/year
$2,338
334
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu