IAC Assessment: UM0461
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0461
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2015
Principal Product bread and rolls
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 183
Plant Area (Sq.Ft.) 60,000
Annual Production 68,668,823 Pounds
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $403,187 6,167,759 kWh $0.07
Natural Gas $383,213 61,807 MMBtu $6.20
TOTAL ENERGY COSTS $809,563
RECOMMENDED SAVINGS* $19,221 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,985
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$940
Cost:
$800
$940 14,480 - - $940
14,480
kWh
-
-
MMBtu
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,840
Cost:
$475
$1,840 28,305 - - $1,840
28,305
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,057
Cost:
$2,000
$2,057 31,649 - - $2,057
31,649
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,928
Cost:
$1,000
$5,928 91,202 - - $5,928
91,202
kWh
-
-
MMBtu
05: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$479
Cost:
$200
$479 7,367 - - $479
7,367
kWh
-
-
MMBtu
06: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$195
Cost:
$1,000
$195 3,000 - - $195
3,000
kWh
-
-
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,782
Cost:
$3,000
- - $7,782 1,255 -
-
kWh
$7,782
1,255
MMBtu
TOTAL RECOMMENDED Savings:
$19,221
Cost:
$8,475
$11,439 176,003 $7,782 1,255 $11,439
176,003
kWh
$7,782
1,255
MMBtu
TOTAL IMPLEMENTED Savings:
$7,985
Cost:
$3,000
$7,985 122,851 - - $7,985
122,851
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas