IAC Assessment: UM0471
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0471
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2016
Principal Product Industrial Coatings Resins
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2812 - Alkalies And Chlorine
Sales $10,000,000-$50,000,000
# of Employees 27
Plant Area (Sq.Ft.) 116,950
Annual Production 48,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $253,536 2,980,713 kWh $0.09
Natural Gas $126,891 42,216 MMBtu $3.01
TOTAL ENERGY COSTS $380,427
RECOMMENDED SAVINGS* $13,631 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,290
Cost:
$500
$1,290 18,863 - - $1,290
18,863
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,462
Cost:
$1,750
$1,462 21,504 - - $1,462
21,504
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$696
Cost:
$2,500
$696 10,239 - - $696
10,239
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,519
Cost:
$5,500
$8,519 125,278 - - $8,519
125,278
kWh
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,664
Cost:
$3,435
- - $1,664 693 -
-
kWh
$1,664
693
MMBtu
TOTAL RECOMMENDED Savings:
$13,631
Cost:
$13,685
$11,967 175,884 $1,664 693 $11,967
175,884
kWh
$1,664
693
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas