IAC logo
IAC Assessment: UU0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2003
Principal Product rocket motor casings
NAICS 332313 - Plate Work Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 77,000
Annual Production 100 Pieces
Production Hrs. Annual 4,160
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,221 2,313,137 kWh $0.02
Electricity Demand $23,351 3,879 kW-months/year $6.02
Electricity Fees $4,223 - $ -
Natural Gas $79,705 28,088 MMBtu $2.84
TOTAL ENERGY COSTS $156,500
RECOMMENDED SAVINGS* $32,157 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,557
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,212
Cost:
$710
$7,372 313,700 $2,840 430 - - $7,372
313,700
kWh
$2,840
430
kW-months/year
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,536
Cost:
$4,800
$2,460 105,400 $1,076 163 - - $2,460
105,400
kWh
$1,076
163
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,044
Cost:
$9,000
$5,798 248,300 $2,246 340 - - $5,798
248,300
kWh
$2,246
340
kW-months/year
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,693
Cost:
-
$932 39,900 $761 115 - - $932
39,900
kWh
$761
115
kW-months/year
-
-
MMBtu
05: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$3,430
Cost:
$7,126
- - - - $3,430 1,234 -
-
kWh
-
-
kW-months/year
$3,430
1,234
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$301
Cost:
$150
$135 5,800 $166 25 - - $135
5,800
kWh
$166
25
kW-months/year
-
-
MMBtu
07: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$4,941
Cost:
$765
$819 35,100 $4,122 624 - - $819
35,100
kWh
$4,122
624
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$32,157
Cost:
$22,551
$17,516 748,200 $11,211 1,697 $3,430 1,234 $17,516
748,200
kWh
$11,211
1,697
kW-months/year
$3,430
1,234
MMBtu
TOTAL IMPLEMENTED Savings:
$18,557
Cost:
$9,860
$13,305 567,800 $5,252 795 - - $13,305
567,800
kWh
$5,252
795
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas