IAC logo
IAC Assessment: UU0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2003
Principal Product composite structures
NAICS 336415 - Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing
SIC 3764 - Space Propulsion Units And Parts
Sales $100,000,000-$500,000,000
# of Employees 430
Plant Area (Sq.Ft.) 480,000
Annual Production 500 Pieces
Production Hrs. Annual 6,240
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $246,621 8,891,400 kWh $0.03
Electricity Demand $191,103 23,592 kW-months/year $8.10
Electricity Fees $43,191 - $ -
Natural Gas $95,757 21,818 MMBtu $4.39
TOTAL ENERGY COSTS $576,672
RECOMMENDED SAVINGS* $22,554 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,232
Cost:
-
$2,432 79,900 $3,800 154 - - - - $2,432
79,900
kWh
$3,800
154
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$744
Cost:
$340
$466 14,700 $278 31 - - - - $466
14,700
kWh
$278
31
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,845
Cost:
$961
$1,208 39,700 $637 72 - - - - $1,208
39,700
kWh
$637
72
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,130
Cost:
$11,800
$4,605 151,300 $2,525 284 - - - - $4,605
151,300
kWh
$2,525
284
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$2,823
Cost:
-
$750 24,700 $421 47 $1,652 368 - - $750
24,700
kWh
$421
47
kW-months/year
$1,652
368
MMBtu
-
-
Tgal
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,510
Cost:
$5,980
- - - - $1,510 337 - - -
-
kWh
-
-
kW-months/year
$1,510
337
MMBtu
-
-
Tgal
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,270
Cost:
$8,450
- - - - - - $2,270 748,800 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,270
748,800
Tgal
TOTAL RECOMMENDED Savings:
$22,554
Cost:
$27,531
$9,461 310,300 $7,661 588 $3,162 705 $2,270 748,800 $9,461
310,300
kWh
$7,661
588
kW-months/year
$3,162
705
MMBtu
$2,270
748,800
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal