IAC logo
IAC Assessment: UU0055
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0055
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2003
Principal Product ELECTRONIC HARDWARE
NAICS 333515 - Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3429 - Hardware, Nec
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 100,000
Annual Production 231,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,962 2,204,720 kWh $0.04
Electricity Demand $18,482 6,770 kW-months/year $2.73
Electricity Fees $4,427 - $ -
Natural Gas $25,601 45,187 MMBtu $0.57
TOTAL ENERGY COSTS $144,472
RECOMMENDED SAVINGS* $27,409 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$710
Cost:
$710
$587 18,000 $123 52 - - $587
18,000
kWh
$123
52
kW-months/year
-
-
MMBtu
02: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$659
Cost:
$500
$544 16,640 $115 48 - - $544
16,640
kWh
$115
48
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$430
Cost:
$1,870
- - - - $430 790 -
-
kWh
-
-
kW-months/year
$430
790
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$889
Cost:
$349
$694 21,216 $195 82 - - $694
21,216
kWh
$195
82
kW-months/year
-
-
MMBtu
05: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$2,492
Cost:
$39,000
$1,844 56,400 $648 271 - - $1,844
56,400
kWh
$648
271
kW-months/year
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,273
Cost:
$7,500
$7,236 221,347 $2,037 851 - - $7,236
221,347
kWh
$2,037
851
kW-months/year
-
-
MMBtu
07: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$12,956
Cost:
$21,000
$12,170 372,300 $1,219 510 $(-433) (-773) $12,170
372,300
kWh
$1,219
510
kW-months/year
$(-433)
(-773)
MMBtu
TOTAL RECOMMENDED Savings:
$27,409
Cost:
$70,929
$23,075 705,903 $4,337 1,814 $(-3) 17 $23,075
705,903
kWh
$4,337
1,814
kW-months/year
$(-3)
17
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas