IAC logo
IAC Assessment: UU0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product minerals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 200,000
Annual Production 4,700,000 Pounds
Production Hrs. Annual 4,212
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,407 1,637,040 kWh $0.03
Electricity Demand $47,507 5,865 kW-months/year $8.10
Electricity Fees $13,947 - $ -
Natural Gas $111,955 20,683 MMBtu $5.41
TOTAL ENERGY COSTS $218,816
RECOMMENDED SAVINGS* $28,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,393
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$14,228
Cost:
$70,000
$(-821) (-25,311) $(-757) (-80) $15,806 2,689 - - $(-821)
(-25,311)
kWh
$(-757)
(-80)
kW-months/year
$15,806
2,689
MMBtu
-
-
$
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$2,876
Cost:
$2,255
$(-2,281) (-73,440) $(-1,022) (-108) $6,179 1,051 - - $(-2,281)
(-73,440)
kWh
$(-1,022)
(-108)
kW-months/year
$6,179
1,051
MMBtu
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,624
Cost:
$2,400
$125 3,851 $2,499 264 - - - - $125
3,851
kWh
$2,499
264
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,252
Cost:
$1,754
- - - - $1,252 213 - - -
-
kWh
-
-
kW-months/year
$1,252
213
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,785
Cost:
-
$869 26,835 $916 97 - - - - $869
26,835
kWh
$916
97
kW-months/year
-
-
MMBtu
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,480
Cost:
-
- - - - - - $5,480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,480
-
$
TOTAL RECOMMENDED Savings:
$28,245
Cost:
$76,409
$(-2,108) (-68,065) $1,636 173 $23,237 3,953 $5,480 - $(-2,108)
(-68,065)
kWh
$1,636
173
kW-months/year
$23,237
3,953
MMBtu
$5,480
-
$
TOTAL IMPLEMENTED Savings:
$11,393
Cost:
$4,009
$(-1,412) (-46,605) $(-106) (-11) $7,431 1,264 $5,480 - $(-1,412)
(-46,605)
kWh
$(-106)
(-11)
kW-months/year
$7,431
1,264
MMBtu
$5,480
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes