Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2004 |
Principal Product | tables and chairs |
NAICS | 337127 - Institutional Furniture Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $50,000,000-$100,000,000 |
# of Employees | 310 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 31,875,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $91,486 | 3,298,330 | kWh | $0.03 |
Electricity Demand | $102,198 | 11,859 | kW-months/year | $8.62 |
Electricity Fees | $39,964 | - | $ | - |
Natural Gas | $141,648 | 29,433 | MMBtu | $4.81 |
TOTAL ENERGY COSTS | $375,296 | |||
RECOMMENDED SAVINGS* | $53,671 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,573 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $21,193 Cost: $325 |
- | - | - | - | $21,193 | 3,868 | - | - |
- - kWh |
- - kW-months/year |
$21,193 3,868 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,711 Cost: $3,315 |
$(-396) | (-12,994) | $(-383) | (-43) | $9,490 | 1,732 | - | - |
$(-396) (-12,994) kWh |
$(-383) (-43) kW-months/year |
$9,490 1,732 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $5,381 Cost: $7,500 |
$(-113) | (-3,701) | $(-53) | (-6) | $5,547 | 1,013 | - | - |
$(-113) (-3,701) kWh |
$(-53) (-6) kW-months/year |
$5,547 1,013 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,006 Cost: $8,929 |
- | - | - | - | $5,006 | 914 | - | - |
- - kWh |
- - kW-months/year |
$5,006 914 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,004 Cost: $244 |
$562 | 18,436 | $442 | 50 | - | - | - | - |
$562 18,436 kWh |
$442 50 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT |
Savings: $12,376 Cost: $1,292 |
- | - | - | - | - | - | $12,376 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$12,376 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,671 Cost: $21,605 |
$53 | 1,741 | $6 | 1 | $41,236 | 7,527 | $12,376 | - | $53 1,741 kWh |
$6 1 kW-months/year |
$41,236 7,527 MMBtu |
$12,376 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,573 Cost: $1,861 |
$562 | 18,436 | $442 | 50 | $21,193 | 3,868 | $12,376 | - | $562 18,436 kWh |
$442 50 kW-months/year |
$21,193 3,868 MMBtu |
$12,376 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |