IAC logo
IAC Assessment: UU0088
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0088
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2005
Principal Product Guidance Systems
NAICS 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812 - Search And Navigation Equipment
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 238,000
Annual Production 4,000 Pieces
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,063,868 33,278,102 kWh $0.03
Natural Gas $147,500 25,937 MMBtu $5.69
TOTAL ENERGY COSTS $1,211,368
RECOMMENDED SAVINGS* $94,208 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$51,720
Cost:
$68,760
- - - - - - $51,720 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$51,720
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$703
Cost:
$6,400
$86 3,100 $617 48 - - - - $86
3,100
kWh
$617
48
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,915
Cost:
$900
$1,170 42,380 $745 58 - - - - $1,170
42,380
kWh
$745
58
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$17,670
Cost:
$19,930
- - - - $17,670 2,340 - - -
-
kWh
-
-
kW-months/year
$17,670
2,340
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,940
Cost:
$30,000
- - - - $6,940 920 - - -
-
kWh
-
-
kW-months/year
$6,940
920
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$15,260
Cost:
$13,990
- - - - - - $15,260 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,260
-
$
TOTAL RECOMMENDED Savings:
$94,208
Cost:
$139,980
$1,256 45,480 $1,362 106 $24,610 3,260 $66,980 - $1,256
45,480
kWh
$1,362
106
kW-months/year
$24,610
3,260
MMBtu
$66,980
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost