IAC logo
IAC Assessment: UU0089
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0089
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2005
Principal Product undergarments
NAICS 315240 - Women’s, Girls’, and Infants’ Cut and Sew Apparel Manufacturing
SIC 2341 - Women's, Misses', Children's, and Infants' Underwear and Nightwear
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 316,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 2,800
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,461 3,405,600 kWh $0.03
Electricity Demand $120,569 11,902 kW-months/year $10.13
Natural Gas $83,086 12,864 MMBtu $6.46
TOTAL ENERGY COSTS $298,116
RECOMMENDED SAVINGS* $64,590 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,810
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,110
Cost:
$4,290
- - $1,110 114 - - -
-
kWh
$1,110
114
kW-months/year
-
-
MMBtu
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$1,820
Cost:
$1,500
- - - - $1,820 260 -
-
kWh
-
-
kW-months/year
$1,820
260
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,940
Cost:
$21,000
- - - - $17,940 2,525 -
-
kWh
-
-
kW-months/year
$17,940
2,525
MMBtu
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$33,020
Cost:
$2,085
$19,270 636,410 $13,750 1,416 - - $19,270
636,410
kWh
$13,750
1,416
kW-months/year
-
-
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,700
Cost:
$2,000
- - - - $10,700 1,510 -
-
kWh
-
-
kW-months/year
$10,700
1,510
MMBtu
TOTAL RECOMMENDED Savings:
$64,590
Cost:
$30,875
$19,270 636,410 $14,860 1,530 $30,460 4,295 $19,270
636,410
kWh
$14,860
1,530
kW-months/year
$30,460
4,295
MMBtu
TOTAL IMPLEMENTED Savings:
$11,810
Cost:
$6,290
- - $1,110 114 $10,700 1,510 -
-
kWh
$1,110
114
kW-months/year
$10,700
1,510
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas