IAC logo
IAC Assessment: UU0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product Rocket Motor
NAICS 336415 - Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing
SIC 3764 - Space Propulsion Units And Parts
Sales $100,000,000-$500,000,000
# of Employees 900
Plant Area (Sq.Ft.) 80,000
Annual Production 60 Pieces
Production Hrs. Annual 8,700
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,677,000 42,879,000 kWh $0.04
Natural Gas $4,962,900 589,770 MMBtu $8.41
TOTAL ENERGY COSTS $6,639,900
RECOMMENDED SAVINGS* $398,590 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
-
Cost:
-
- - - - $100,000 11,890 $(-100,000) - -
-
kWh
-
-
kW-months/year
$100,000
11,890
MMBtu
$(-100,000)
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$121,540
Cost:
$8,720
- - - - $121,540 14,450 - - -
-
kWh
-
-
kW-months/year
$121,540
14,450
MMBtu
-
-
$
03: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$140,530
Cost:
$250,000
- - - - $140,530 16,700 - - -
-
kWh
-
-
kW-months/year
$140,530
16,700
MMBtu
-
-
$
04: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$69,680
Cost:
$200,000
- - - - $69,680 8,280 - - -
-
kWh
-
-
kW-months/year
$69,680
8,280
MMBtu
-
-
$
05: 2.6213 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS Savings:
$65,810
Cost:
$442,960
- - - - $65,810 7,820 - - -
-
kWh
-
-
kW-months/year
$65,810
7,820
MMBtu
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,030
Cost:
-
$680 32,520 $350 89 - - - - $680
32,520
kWh
$350
89
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$398,590
Cost:
$901,680
$680 32,520 $350 89 $497,560 59,140 $(-100,000) - $680
32,520
kWh
$350
89
kW-months/year
$497,560
59,140
MMBtu
$(-100,000)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes