IAC logo
IAC Assessment: UU0113
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product Steel Rebar
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales >$500,000,000
# of Employees 380
Plant Area (Sq.Ft.) 750,000
Annual Production 1,000,000 Tons
Production Hrs. Annual 8,736
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $10,177,664 603,120,000 kWh $0.02
Electricity Demand $9,418,651 1,093,920 kW-months/year $8.61
TOTAL ENERGY COSTS $19,596,315
RECOMMENDED SAVINGS* $310,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,620
Cost:
$180
$3,360 83,890 $1,460 169 $(-1,200) - $3,360
83,890
kWh
$1,460
169
kW-months/year
$(-1,200)
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$173,190
Cost:
$46,250
$133,750 3,343,840 $39,440 4,581 - - $133,750
3,343,840
kWh
$39,440
4,581
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$45,530
Cost:
$20,000
$35,160 879,080 $10,370 1,204 - - $35,160
879,080
kWh
$10,370
1,204
kW-months/year
-
-
$
04: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$87,860
Cost:
$500,000
$67,200 1,680,000 $20,660 2,400 - - $67,200
1,680,000
kWh
$20,660
2,400
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$310,200
Cost:
$566,430
$239,470 5,986,810 $71,930 8,354 $(-1,200) - $239,470
5,986,810
kWh
$71,930
8,354
kW-months/year
$(-1,200)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes