Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2006 |
Principal Product | Steel Rebar |
NAICS | 331110 - Iron and Steel Mills and Ferroalloy Manufacturing |
SIC | 3312 - Blast Furnaces And Steel Mills |
Sales | >$500,000,000 |
# of Employees | 380 |
Plant Area (Sq.Ft.) | 750,000 |
Annual Production | 1,000,000 Tons |
Production Hrs. Annual | 8,736 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $10,177,664 | 603,120,000 | kWh | $0.02 |
Electricity Demand | $9,418,651 | 1,093,920 | kW-months/year | $8.61 |
TOTAL ENERGY COSTS | $19,596,315 | |||
RECOMMENDED SAVINGS* | $310,200 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,620 Cost: $180 |
$3,360 | 83,890 | $1,460 | 169 | $(-1,200) | - |
$3,360 83,890 kWh |
$1,460 169 kW-months/year |
$(-1,200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $173,190 Cost: $46,250 |
$133,750 | 3,343,840 | $39,440 | 4,581 | - | - |
$133,750 3,343,840 kWh |
$39,440 4,581 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $45,530 Cost: $20,000 |
$35,160 | 879,080 | $10,370 | 1,204 | - | - |
$35,160 879,080 kWh |
$10,370 1,204 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $87,860 Cost: $500,000 |
$67,200 | 1,680,000 | $20,660 | 2,400 | - | - |
$67,200 1,680,000 kWh |
$20,660 2,400 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $310,200 Cost: $566,430 |
$239,470 | 5,986,810 | $71,930 | 8,354 | $(-1,200) | - | $239,470 5,986,810 kWh |
$71,930 8,354 kW-months/year |
$(-1,200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes |