Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2017 |
Principal Product | potato chips, corn chips |
NAICS | 311919 - Other Snack Food Manufacturing |
SIC | 2096 - Potato Chips And Similar Snacks |
Sales | $100,000,000-$500,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 262,500 |
Annual Production | 240,000,000 Units |
Production Hrs. Annual | 8,712 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $347,181 | 9,266,641 | kWh | $0.04 |
Electricity Demand | $11,459 | 911 | kW-months/year | $12.58 |
Natural Gas | $111,838 | 33,585 | MMBtu | $3.33 |
TOTAL ENERGY COSTS | $766,235 | |||
RECOMMENDED SAVINGS* | $293,718 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,619 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $207,807 Cost: $2,000,000 |
$(-34,369) | (-954,720) | $(-27,324) | (-2,172) | - | - | - | - | - | - | - | - | $269,500 | 2,183,618 |
$(-34,369) (-954,720) kWh |
$(-27,324) (-2,172) kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - Tgal |
$269,500 2,183,618 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $27,838 Cost: $3,980 |
- | - | - | - | - | - | - | - | $26,499 | 10,950 | $1,339 | 10,950 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$26,499 10,950 Tgal |
$1,339 10,950 Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1224 REPLACE BOILER |
Savings: $26,315 Cost: $176,427 |
- | - | - | - | - | - | $26,315 | 7,902 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$26,315 7,902 MMBtu |
- - Tgal |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $14,977 Cost: $8,120 |
- | - | - | - | - | - | $14,977 | 4,498 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$14,977 4,498 MMBtu |
- - Tgal |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $10,358 Cost: $90 |
$5,787 | 156,394 | $3,472 | 272 | $1,099 | - | - | - | - | - | - | - | - | - |
$5,787 156,394 kWh |
$3,472 272 kW-months/year |
$1,099 - $ |
- - MMBtu |
- - Tgal |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $6,423 Cost: $2,000 |
- | - | - | - | - | - | $6,423 | 1,929 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$6,423 1,929 MMBtu |
- - Tgal |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $293,718 Cost: $2,190,617 |
$(-28,582) | (-798,326) | $(-23,852) | (-1,900) | $1,099 | - | $47,715 | 14,329 | $26,499 | 10,950 | $1,339 | 10,950 | $269,500 | 2,183,618 | $(-28,582) (-798,326) kWh |
$(-23,852) (-1,900) kW-months/year |
$1,099 - $ |
$47,715 14,329 MMBtu |
$26,499 10,950 Tgal |
$1,339 10,950 Tgal |
$269,500 2,183,618 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,619 Cost: $6,070 |
$5,787 | 156,394 | $3,472 | 272 | $1,099 | - | $6,423 | 1,929 | $26,499 | 10,950 | $1,339 | 10,950 | - | - | $5,787 156,394 kWh |
$3,472 272 kW-months/year |
$1,099 - $ |
$6,423 1,929 MMBtu |
$26,499 10,950 Tgal |
$1,339 10,950 Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Water Disposal | Solid Waste (non-haz) |