IAC logo
IAC Assessment: UU0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2017
Principal Product potato chips, corn chips
NAICS 311919 - Other Snack Food Manufacturing
SIC 2096 - Potato Chips And Similar Snacks
Sales $100,000,000-$500,000,000
# of Employees 150
Plant Area (Sq.Ft.) 262,500
Annual Production 240,000,000 Units
Production Hrs. Annual 8,712
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $347,181 9,266,641 kWh $0.04
Electricity Demand $11,459 911 kW-months/year $12.58
Natural Gas $111,838 33,585 MMBtu $3.33
TOTAL ENERGY COSTS $766,235
RECOMMENDED SAVINGS* $293,718 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,619
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ Tgal $ lb
01: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$207,807
Cost:
$2,000,000
$(-34,369) (-954,720) $(-27,324) (-2,172) - - - - - - - - $269,500 2,183,618 $(-34,369)
(-954,720)
kWh
$(-27,324)
(-2,172)
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$269,500
2,183,618
lb
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$27,838
Cost:
$3,980
- - - - - - - - $26,499 10,950 $1,339 10,950 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$26,499
10,950
Tgal
$1,339
10,950
Tgal
-
-
lb
03: 2.1224 REPLACE BOILER Savings:
$26,315
Cost:
$176,427
- - - - - - $26,315 7,902 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$26,315
7,902
MMBtu
-
-
Tgal
-
-
Tgal
-
-
lb
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,977
Cost:
$8,120
- - - - - - $14,977 4,498 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$14,977
4,498
MMBtu
-
-
Tgal
-
-
Tgal
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,358
Cost:
$90
$5,787 156,394 $3,472 272 $1,099 - - - - - - - - - $5,787
156,394
kWh
$3,472
272
kW-months/year
$1,099
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
lb
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,423
Cost:
$2,000
- - - - - - $6,423 1,929 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,423
1,929
MMBtu
-
-
Tgal
-
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$293,718
Cost:
$2,190,617
$(-28,582) (-798,326) $(-23,852) (-1,900) $1,099 - $47,715 14,329 $26,499 10,950 $1,339 10,950 $269,500 2,183,618 $(-28,582)
(-798,326)
kWh
$(-23,852)
(-1,900)
kW-months/year
$1,099
-
$
$47,715
14,329
MMBtu
$26,499
10,950
Tgal
$1,339
10,950
Tgal
$269,500
2,183,618
lb
TOTAL IMPLEMENTED Savings:
$44,619
Cost:
$6,070
$5,787 156,394 $3,472 272 $1,099 - $6,423 1,929 $26,499 10,950 $1,339 10,950 - - $5,787
156,394
kWh
$3,472
272
kW-months/year
$1,099
-
$
$6,423
1,929
MMBtu
$26,499
10,950
Tgal
$1,339
10,950
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ Tgal $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Water Disposal Solid Waste (non-haz)