IAC logo
IAC Assessment: UU0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2018
Principal Product Breakfast Cereal
NAICS 311230 - Breakfast Cereal Manufacturing
SIC 2043 - Cereal Breakfast Foods
Sales >$500,000,000
# of Employees 220
Plant Area (Sq.Ft.) 381,600
Annual Production 130,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,930,195 25,602,518 kWh $0.08
Natural Gas $1,018,839 291,875 MMBtu $3.49
TOTAL ENERGY COSTS $2,949,034
RECOMMENDED SAVINGS* $135,895 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $87,447
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$48,448
Cost:
$23,000
$34,732 460,631 $13,716 3,929 $34,732
460,631
kWh
$13,716
3,929
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$37,021
Cost:
$24,600
$37,021 491,000 - - $37,021
491,000
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$26,521
Cost:
$17,000
- - $26,521 7,597 -
-
kWh
$26,521
7,597
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$11,622
Cost:
$7,600
- - $11,622 3,330 -
-
kWh
$11,622
3,330
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,310
Cost:
$7,650
$11,310 150,000 - - $11,310
150,000
kWh
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$973
Cost:
$3,500
$973 12,900 - - $973
12,900
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$135,895
Cost:
$83,350
$84,035 1,114,531 $51,859 14,856 $84,035
1,114,531
kWh
$51,859
14,856
MMBtu
TOTAL IMPLEMENTED Savings:
$87,447
Cost:
$60,350
$49,304 653,900 $38,143 10,927 $49,304
653,900
kWh
$38,143
10,927
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas