IAC Assessment: UU0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2019
Principal Product Air bag initiators
NAICS 336320 - Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 412
Plant Area (Sq.Ft.) 191,030
Annual Production 170,000,000 Units
Production Hrs. Annual 6,240
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $690,748 18,429,382 kWh $0.04
Electricity Demand $587,504 33,197 kW-months/year $17.70
Electricity Fees $39,811 - $ -
Natural Gas $88,895 12,554 MMBtu $7.08
TOTAL ENERGY COSTS $1,406,959
RECOMMENDED SAVINGS* $42,942 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,668
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$22,415
Cost:
$2,000
$22,415 605,810 - - - - $22,415
605,810
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,232
Cost:
$9,119
$3,319 89,698 $2,913 165 - - $3,319
89,698
kWh
$2,913
165
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,922
Cost:
$2,000
$3,578 96,718 $2,344 132 - - $3,578
96,718
kWh
$2,344
132
kW-months/year
-
-
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,500
Cost:
-
$2,390 64,592 $2,110 119 - - $2,390
64,592
kWh
$2,110
119
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,388
Cost:
$3,125
$1,193 32,255 $1,195 68 - - $1,193
32,255
kWh
$1,195
68
kW-months/year
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$831
Cost:
$400
- - - - $831 118 -
-
kWh
-
-
kW-months/year
$831
118
MMBtu
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$655
Cost:
$748
$161 4,352 $494 28 - - $161
4,352
kWh
$494
28
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$42,942
Cost:
$17,392
$33,056 893,425 $9,056 511 $831 118 $33,056
893,425
kWh
$9,056
511
kW-months/year
$831
118
MMBtu
TOTAL IMPLEMENTED Savings:
$33,668
Cost:
$4,400
$28,383 767,120 $4,454 252 $831 118 $28,383
767,120
kWh
$4,454
252
kW-months/year
$831
118
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas