IAC logo
IAC Assessment: UU0144
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0144
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2019
Principal Product Rotational Molding Fencing
NAICS 339999 - All Other Miscellaneous Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 100,000 Units
Production Hrs. Annual 6,624
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,755 2,964,031 kWh $0.04
Electricity Demand $117,092 7,020 kW-months/year $16.68
Electricity Fees $24,408 - $ -
Natural Gas $263,007 69,058 MMBtu $3.81
TOTAL ENERGY COSTS $513,262
RECOMMENDED SAVINGS* $68,256 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,066
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$42,296
Cost:
$1,068
- - - - - - $42,296 11,101 -
-
kWh
-
-
kW-months/year
-
-
$
$42,296
11,101
MMBtu
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$16,349
Cost:
$400
- - - - $16,349 - - - -
-
kWh
-
-
kW-months/year
$16,349
-
$
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,190
Cost:
$6,000
- - - - $6,190 - - - -
-
kWh
-
-
kW-months/year
$6,190
-
$
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,420
Cost:
$128
$1,880 51,114 $1,540 93 - - - - $1,880
51,114
kWh
$1,540
93
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$68,256
Cost:
$7,596
$1,880 51,114 $1,540 93 $22,539 - $42,296 11,101 $1,880
51,114
kWh
$1,540
93
kW-months/year
$22,539
-
$
$42,296
11,101
MMBtu
TOTAL IMPLEMENTED Savings:
$62,066
Cost:
$1,596
$1,880 51,114 $1,540 93 $16,349 - $42,296 11,101 $1,880
51,114
kWh
$1,540
93
kW-months/year
$16,349
-
$
$42,296
11,101
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas