IAC logo
IAC Assessment: UU0153
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0153
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2019
Principal Product Treated water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 10
Plant Area (Sq.Ft.) 25,000
Annual Production 3,650,000 Units
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,368 3,154,800 kWh $0.04
Electricity Demand $66,758 5,868 kW-months/year $11.38
Natural Gas $37,959 5,415 MMBtu $7.01
TOTAL ENERGY COSTS $241,085
RECOMMENDED SAVINGS* $96,968 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,021
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$48,728
Cost:
$423,632
$33,253 769,202 $24,226 2,129 - - $(-8,750) - - - - - $33,253
769,202
kWh
$24,226
2,129
kW-months/year
-
-
MMBtu
$(-8,750)
-
$
-
-
$
-
-
$
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$14,902
Cost:
$205,000
$10,639 246,099 $4,263 375 - - - - - - - - $10,639
246,099
kWh
$4,263
375
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$22,776
Cost:
$146,977
$24,615 569,400 $8,876 780 $(-6,161) (-3,020) - - - - $(-4,555) - $24,615
569,400
kWh
$8,876
780
kW-months/year
$(-6,161)
(-3,020)
MMBtu
-
-
$
-
-
$
$(-4,555)
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,443
Cost:
$502
- - - - $5,443 776 - - - - - - -
-
kWh
-
-
kW-months/year
$5,443
776
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$2,777
Cost:
$6,500
- - - - - - - - $2,777 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,777
-
$
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$899
Cost:
$2,019
$930 21,510 $612 54 $(-643) (-92) - - - - - - $930
21,510
kWh
$612
54
kW-months/year
$(-643)
(-92)
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$1,444
Cost:
$400
- - - - $1,444 206 - - - - - - -
-
kWh
-
-
kW-months/year
$1,444
206
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$96,968
Cost:
$785,030
$69,437 1,606,211 $37,977 3,337 $83 (-2,130) $(-8,750) - $2,777 - $(-4,555) - $69,437
1,606,211
kWh
$37,977
3,337
kW-months/year
$83
(-2,130)
MMBtu
$(-8,750)
-
$
$2,777
-
$
$(-4,555)
-
$
TOTAL IMPLEMENTED Savings:
$20,021
Cost:
$213,919
$11,569 267,609 $4,875 428 $801 114 - - $2,777 - - - $11,569
267,609
kWh
$4,875
428
kW-months/year
$801
114
MMBtu
-
-
$
$2,777
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost