IAC Assessment: UU0159
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2020
Principal Product Portland Cement
NAICS 327310 - Cement Manufacturing
SIC 3241 - Cement, Hydraulic
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 1,250,000 Tons
Production Hrs. Annual 8,250
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,639,188 112,390,000 kWh $0.03
Electricity Demand $2,535,070 187,640 kW-months/year $13.51
Electricity Fees $96,333 - $ -
TOTAL ENERGY COSTS $6,270,592
RECOMMENDED SAVINGS* $295,317 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,542
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$190,938
Cost:
$844,579
$145,559 4,495,343 $88,338 6,539 $(-42,959) - $145,559
4,495,343
kWh
$88,338
6,539
kW-months/year
$(-42,959)
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$47,066
Cost:
$8,500
$25,406 784,629 $21,659 1,603 - - $25,406
784,629
kWh
$21,659
1,603
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$38,476
Cost:
$12,000
$38,476 1,188,265 - - - - $38,476
1,188,265
kWh
-
-
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,384
Cost:
$1,000
$6,462 199,568 $3,922 290 - - $6,462
199,568
kWh
$3,922
290
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,454
Cost:
$16,900
$8,454 261,073 - - - - $8,454
261,073
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$295,317
Cost:
$882,979
$224,358 6,928,878 $113,918 8,432 $(-42,959) - $224,358
6,928,878
kWh
$113,918
8,432
kW-months/year
$(-42,959)
-
$
TOTAL IMPLEMENTED Savings:
$85,542
Cost:
$20,500
$63,883 1,972,894 $21,659 1,603 - - $63,883
1,972,894
kWh
$21,659
1,603
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost