Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2020 |
Principal Product | Ice cream and novelties |
NAICS | 311520 - Ice Cream and Frozen Dessert Manufacturing |
SIC | 2024 - Ice Cream And Frozen Desserts |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 141,912 |
Annual Production | 10,500,000 Pieces |
Production Hrs. Annual | 8,720 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,056,233 | 32,117,120 | kWh | $0.03 |
Electricity Demand | $833,677 | 61,345 | kW-months/year | $13.59 |
Electricity Fees | $150,865 | - | $ | - |
Natural Gas | $270,305 | 74,100 | MMBtu | $3.65 |
TOTAL ENERGY COSTS | $3,287,231 | |||
RECOMMENDED SAVINGS* | $84,025 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $76,195 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $43,260 Cost: $86,000 |
- | - | - | - | - | - | - | - | $43,260 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$43,260 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $22,840 Cost: $53,000 |
$4,840 | 146,640 | - | - | - | - | $18,000 | - | - | - |
$4,840 146,640 kWh |
- - kW-months/year |
- - MMBtu |
$18,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,315 Cost: $7,880 |
$8,585 | 260,170 | - | - | - | - | $(-270) | - | - | - |
$8,585 260,170 kWh |
- - kW-months/year |
- - MMBtu |
$(-270) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,370 Cost: $5,370 |
$3,150 | 95,420 | $2,220 | 163 | - | - | - | - | - | - |
$3,150 95,420 kWh |
$2,220 163 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2522 ISOLATE HOT OR COLD EQUIPMENT |
Savings: $2,460 Cost: $9,000 |
$(-1,670) | (-50,460) | $(-940) | (-69) | $5,070 | 1,390 | - | - | - | - |
$(-1,670) (-50,460) kWh |
$(-940) (-69) kW-months/year |
$5,070 1,390 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,780 Cost: $6,880 |
$1,130 | 34,430 | $650 | 48 | - | - | - | - | - | - |
$1,130 34,430 kWh |
$650 48 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $84,025 Cost: $168,130 |
$16,035 | 486,200 | $1,930 | 142 | $5,070 | 1,390 | $17,730 | - | $43,260 | - | $16,035 486,200 kWh |
$1,930 142 kW-months/year |
$5,070 1,390 MMBtu |
$17,730 - $ |
$43,260 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $76,195 Cost: $153,760 |
$14,555 | 441,240 | $650 | 48 | - | - | $17,730 | - | $43,260 | - | $14,555 441,240 kWh |
$650 48 kW-months/year |
- - MMBtu |
$17,730 - $ |
$43,260 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost |