IAC logo
IAC Assessment: UU0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2020
Principal Product Automotive Safety products
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales >$500,000,000
# of Employees 1,800
Plant Area (Sq.Ft.) 350,000
Annual Production 37,440,000 Units
Production Hrs. Annual 6,720
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $574,475 17,304,137 kWh $0.03
Electricity Demand $490,599 35,179 kW-months/year $13.95
Electricity Fees $97,643 - $ -
Natural Gas $48,749 15,638 MMBtu $3.12
TOTAL ENERGY COSTS $1,211,466
RECOMMENDED SAVINGS* $37,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,890
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$18,825
Cost:
$21,841
$11,923 361,317 $6,902 495 - - $11,923
361,317
kWh
$6,902
495
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$13,868
Cost:
$2,000
$13,868 420,240 - - - - $13,868
420,240
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$1,681
Cost:
$1,200
$891 26,999 $790 57 - - $891
26,999
kWh
$790
57
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,521
Cost:
$150
$868 26,290 $653 47 - - $868
26,290
kWh
$653
47
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,259
Cost:
$1,259
$718 21,746 $542 39 - - $718
21,746
kWh
$542
39
kW-months/year
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$676
Cost:
$440
- - - - $676 217 -
-
kWh
-
-
kW-months/year
$676
217
MMBtu
TOTAL RECOMMENDED Savings:
$37,830
Cost:
$26,890
$28,268 856,592 $8,887 637 $676 217 $28,268
856,592
kWh
$8,887
637
kW-months/year
$676
217
MMBtu
TOTAL IMPLEMENTED Savings:
$34,890
Cost:
$24,431
$26,659 807,847 $7,555 542 $676 217 $26,659
807,847
kWh
$7,555
542
kW-months/year
$676
217
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas