IAC logo
IAC Assessment: UU0175
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0175
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2021
Principal Product Textiles
NAICS 315190 - Other Apparel Knitting Mills
SIC 2211 - Broadwoven Fabric Mills, Cotton
Sales $50,000,000-$100,000,000
# of Employees 700
Plant Area (Sq.Ft.) 350,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 5,220
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,373 5,904,000 kWh $0.04
Electricity Demand $254,170 14,991 kW-months/year $16.95
Electricity Fees $38,198 - $ -
Natural Gas $103,636 31,938 MMBtu $3.24
TOTAL ENERGY COSTS $647,363
RECOMMENDED SAVINGS* $208,456 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $200,016
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$154,852
Cost:
$42,000
$11,092 291,902 $27,467 1,620 - - $675,000 - $(-558,707) - $11,092
291,902
kWh
$27,467
1,620
kW-months/year
-
-
MMBtu
$675,000
-
$
$(-558,707)
-
$
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$31,653
Cost:
$35,841
$31,653 832,961 - - - - - - - - $31,653
832,961
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.1224 REPLACE BOILER Savings:
$8,979
Cost:
$46,872
- - - - $8,979 2,772 - - - - -
-
kWh
-
-
kW-months/year
$8,979
2,772
MMBtu
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,660
Cost:
$6,931
$5,660 148,919 - - - - - - - - $5,660
148,919
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$4,532
Cost:
$6,178
$2,235 58,813 $2,297 136 - - - - - - $2,235
58,813
kWh
$2,297
136
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,780
Cost:
$7,027
$2,780 73,151 - - - - - - - - $2,780
73,151
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$208,456
Cost:
$144,849
$53,420 1,405,746 $29,765 1,756 $8,979 2,772 $675,000 - $(-558,707) - $53,420
1,405,746
kWh
$29,765
1,756
kW-months/year
$8,979
2,772
MMBtu
$675,000
-
$
$(-558,707)
-
$
TOTAL IMPLEMENTED Savings:
$200,016
Cost:
$130,891
$44,980 1,183,676 $29,765 1,756 $8,979 2,772 $675,000 - $(-558,707) - $44,980
1,183,676
kWh
$29,765
1,756
kW-months/year
$8,979
2,772
MMBtu
$675,000
-
$
$(-558,707)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material