IAC Assessment: UU0178
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2021
Principal Product Automotive Safety Products
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 275,000
Annual Production 32,500,000 Units
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,847,489 40,873,664 kWh $0.05
Electricity Demand $664,110 77,583 kW-months/year $8.56
Electricity Fees $168,478 - $ -
Natural Gas $31,445 7,487 MMBtu $4.20
TOTAL ENERGY COSTS $2,711,523
RECOMMENDED SAVINGS* $170,253 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$30,811
Cost:
$1,300
$23,635 522,898 $7,176 838 - - - - $23,635
522,898
kWh
$7,176
838
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,654
Cost:
$3,913
$6,468 143,101 $1,674 196 $512 122 - - $6,468
143,101
kWh
$1,674
196
kW-months/year
$512
122
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,347
Cost:
$9,400
$3,187 70,500 $1,161 136 - - - - $3,187
70,500
kWh
$1,161
136
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$99,244
Cost:
$320,000
$104,910 2,321,021 $35,912 4,195 $(-41,578) (-9,900) - - $104,910
2,321,021
kWh
$35,912
4,195
kW-months/year
$(-41,578)
(-9,900)
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,197
Cost:
$9,700
$1,685 37,279 $512 60 - - - - $1,685
37,279
kWh
$512
60
kW-months/year
-
-
MMBtu
-
-
$
06: 2.8124 Hire Energy Manager Savings:
$25,000
Cost:
$7,800
- - - - - - $25,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,000
-
$
TOTAL RECOMMENDED Savings:
$170,253
Cost:
$352,113
$139,885 3,094,799 $46,435 5,424 $(-41,066) (-9,778) $25,000 - $139,885
3,094,799
kWh
$46,435
5,424
kW-months/year
$(-41,066)
(-9,778)
MMBtu
$25,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost