IAC logo
IAC Assessment: UU0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2021
Principal Product Water Treatment
NAICS 237110 - Water and Sewer Line and Related Structures Construction
SIC 1623 - Water, Sewer, And Utility Lines
Sales $10,000,000-$50,000,000
# of Employees 42
Plant Area (Sq.Ft.) 260,000
Annual Production 1,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,218 2,409,300 kWh $0.04
Electricity Demand $65,464 3,968 kW-months/year $16.50
Electricity Fees $3,405 - $ -
Natural Gas $51,309 8,499 MMBtu $6.04
Other Gas $26,561 1,058 MMBtu $25.10
TOTAL ENERGY COSTS $233,958
RECOMMENDED SAVINGS* $34,592 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,096
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.8222 SIZE TRUCKS TO JOB Savings:
$14,756
Cost:
$56,000
- - - - - - $14,756 582 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,756
582
MMBtu
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$14,084
Cost:
$14,000
- - - - - - - - $14,084 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$14,084
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,075
Cost:
$2,348
$2,075 57,318 - - - - - - - - $2,075
57,318
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,665
Cost:
$1,000
$1,032 28,499 $633 38 - - - - - - $1,032
28,499
kWh
$633
38
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,609
Cost:
$100
- - - - $1,609 269 - - - - -
-
kWh
-
-
kW-months/year
$1,609
269
MMBtu
-
-
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$403
Cost:
$100
$8 225 - - $395 66 - - - - $8
225
kWh
-
-
kW-months/year
$395
66
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$34,592
Cost:
$73,548
$3,115 86,042 $633 38 $2,004 335 $14,756 582 $14,084 - $3,115
86,042
kWh
$633
38
kW-months/year
$2,004
335
MMBtu
$14,756
582
MMBtu
$14,084
-
$
TOTAL IMPLEMENTED Savings:
$16,096
Cost:
$14,200
$8 225 - - $2,004 335 - - $14,084 - $8
225
kWh
-
-
kW-months/year
$2,004
335
MMBtu
-
-
MMBtu
$14,084
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes