IAC Assessment: UU0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2021
Principal Product HDPE Conduit
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3084 - Plastics Pipe
Sales $50,000,000-$100,000,000
# of Employees 85
Plant Area (Sq.Ft.) 60,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $385,059 11,064,900 kWh $0.03
Electricity Demand $361,325 19,374 kW-months/year $18.65
Electricity Fees $67,664 - $ -
Natural Gas $13,079 1,726 MMBtu $7.58
TOTAL ENERGY COSTS $827,126
RECOMMENDED SAVINGS* $26,895 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage
$ kWh $ kW-months/year $ Tgal
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,772
Cost:
$5,582
$4,667 134,123 $5,105 274 - - $4,667
134,123
kWh
$5,105
274
kW-months/year
-
-
Tgal
02: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$8,939
Cost:
$3,000
$47,420 1,362,703 $54,023 2,893 $(-92,503) (-41,668) $47,420
1,362,703
kWh
$54,023
2,893
kW-months/year
$(-92,503)
(-41,668)
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,184
Cost:
$2,500
$1,221 35,078 $1,963 105 - - $1,221
35,078
kWh
$1,963
105
kW-months/year
-
-
Tgal
04: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$2,942
Cost:
$2,900
$1,771 50,896 $1,170 63 - - $1,771
50,896
kWh
$1,170
63
kW-months/year
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,058
Cost:
$778
$1,145 32,901 $913 49 - - $1,145
32,901
kWh
$913
49
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$26,895
Cost:
$14,760
$56,224 1,615,701 $63,174 3,384 $(-92,503) (-41,668) $56,224
1,615,701
kWh
$63,174
3,384
kW-months/year
$(-92,503)
(-41,668)
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage