Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2021 |
Principal Product | HDPE Conduit |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3084 - Plastics Pipe |
Sales | $50,000,000-$100,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 35,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $385,059 | 11,064,900 | kWh | $0.03 |
Electricity Demand | $361,325 | 19,374 | kW-months/year | $18.65 |
Electricity Fees | $67,664 | - | $ | - |
Natural Gas | $13,079 | 1,726 | MMBtu | $7.58 |
TOTAL ENERGY COSTS | $827,126 | |||
RECOMMENDED SAVINGS* | $26,895 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Usage | Electricity Usage | Electricity Demand | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $9,772 Cost: $5,582 |
$4,667 | 134,123 | $5,105 | 274 | - | - |
$4,667 134,123 kWh |
$5,105 274 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER |
Savings: $8,939 Cost: $3,000 |
$47,420 | 1,362,703 | $54,023 | 2,893 | $(-92,503) | (-41,668) |
$47,420 1,362,703 kWh |
$54,023 2,893 kW-months/year |
$(-92,503) (-41,668) Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,184 Cost: $2,500 |
$1,221 | 35,078 | $1,963 | 105 | - | - |
$1,221 35,078 kWh |
$1,963 105 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT |
Savings: $2,942 Cost: $2,900 |
$1,771 | 50,896 | $1,170 | 63 | - | - |
$1,771 50,896 kWh |
$1,170 63 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,058 Cost: $778 |
$1,145 | 32,901 | $913 | 49 | - | - |
$1,145 32,901 kWh |
$913 49 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,895 Cost: $14,760 |
$56,224 | 1,615,701 | $63,174 | 3,384 | $(-92,503) | (-41,668) | $56,224 1,615,701 kWh |
$63,174 3,384 kW-months/year |
$(-92,503) (-41,668) Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Usage | Electricity Usage | Electricity Demand | Water Usage |