Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2022 |
Principal Product | trailer hitches |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354 - Aluminum Extruded Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 100,000 Units |
Production Hrs. Annual | 5,500 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $37,668 | 1,042,006 | kWh | $0.04 |
Electricity Demand | $57,089 | 3,531 | kW-months/year | $16.17 |
Electricity Fees | $11,985 | - | $ | - |
Natural Gas | $8,146 | 1,000 | MMBtu | $8.15 |
TOTAL ENERGY COSTS | $114,888 | |||
RECOMMENDED SAVINGS* | $17,617 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,040 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS |
Savings: $10,923 Cost: $250 |
- | - | $10,923 | 676 | - | - |
- - kWh |
$10,923 676 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,577 Cost: $2,577 |
$2,144 | 59,400 | $433 | 27 | - | - |
$2,144 59,400 kWh |
$433 27 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,732 Cost: $7,647 |
$626 | 17,340 | $1,106 | 68 | - | - |
$626 17,340 kWh |
$1,106 68 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,096 Cost: $323 |
$455 | 12,615 | $640 | 40 | - | - |
$455 12,615 kWh |
$640 40 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $779 Cost: $750 |
$352 | 9,746 | $427 | 26 | - | - |
$352 9,746 kWh |
$427 26 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $510 Cost: $640 |
$35 | 960 | - | - | $475 | 58 |
$35 960 kWh |
- - kW-months/year |
$475 58 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,617 Cost: $12,187 |
$3,612 | 100,061 | $13,529 | 837 | $475 | 58 | $3,612 100,061 kWh |
$13,529 837 kW-months/year |
$475 58 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,040 Cost: $9,610 |
$1,468 | 40,661 | $13,096 | 810 | $475 | 58 | $1,468 40,661 kWh |
$13,096 810 kW-months/year |
$475 58 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |