Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2022 |
Principal Product | Aluminum |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3355 - Aluminum Rolling And Drawing, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 245 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 130,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,532,829 | 25,031,995 | kWh | $0.06 |
Natural Gas | $1,966,616 | 479,243 | MMBtu | $4.10 |
TOTAL ENERGY COSTS | $3,499,445 | |||
RECOMMENDED SAVINGS* | $271,900 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $265,727 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Water Usage | Electricity Usage | Electricity Fees | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $139,892 Cost: $110,800 |
$139,892 | 2,293,309 | - | - | - | - |
$139,892 2,293,309 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $79,430 Cost: $1,500 |
- | - | $79,430 | - | - | - |
- - kWh |
$79,430 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $15,730 Cost: $3,713 |
$15,730 | 257,861 | - | - | - | - |
$15,730 257,861 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $23,515 Cost: $750 |
- | - | $23,515 | - | - | - |
- - kWh |
$23,515 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4151 MINIMIZE WATER USAGE |
Savings: $5,292 Cost: $1,764 |
- | - | - | - | $5,292 | 2,801 |
- - kWh |
- - $ |
$5,292 2,801 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $3,388 Cost: $5,440 |
$3,388 | 55,503 | - | - | - | - |
$3,388 55,503 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,868 Cost: $1,019 |
$1,868 | 30,628 | - | - | - | - |
$1,868 30,628 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,802 Cost: $1,125 |
$1,802 | 29,534 | - | - | - | - |
$1,802 29,534 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $983 Cost: $375 |
$983 | 16,115 | - | - | - | - |
$983 16,115 kWh |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $271,900 Cost: $126,486 |
$163,663 | 2,682,950 | $102,945 | - | $5,292 | 2,801 | $163,663 2,682,950 kWh |
$102,945 - $ |
$5,292 2,801 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $265,727 Cost: $119,546 |
$157,490 | 2,581,798 | $102,945 | - | $5,292 | 2,801 | $157,490 2,581,798 kWh |
$102,945 - $ |
$5,292 2,801 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Water Usage | Electricity Usage | Electricity Fees | Water Usage |