Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2023 |
Principal Product | Industrial Apparel and Services |
NAICS | 315280 - Other Cut and Sew Apparel Manufacturing |
SIC | 2389 - Apparel And Accessories, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 2,000 |
Annual Production | 5,500,000 Pounds |
Production Hrs. Annual | 2,100 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $13,959 | 387,760 | kWh | $0.04 |
Electricity Demand | $35,575 | 2,155 | kW-months/year | $16.51 |
Natural Gas | $111,545 | 14,981 | MMBtu | $7.45 |
TOTAL ENERGY COSTS | $170,796 | |||
RECOMMENDED SAVINGS* | $60,007 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,951 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1224 REPLACE BOILER |
Savings: $24,600 Cost: $111,300 |
- | - | - | - | $24,600 | 3,304 | - | - |
- - kWh |
- - kW-months/year |
$24,600 3,304 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $22,030 Cost: $18,300 |
- | - | - | - | - | - | $22,030 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$22,030 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS |
Savings: $7,263 Cost: $12,600 |
- | - | - | - | - | - | $7,263 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,263 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $3,351 Cost: $26,250 |
- | - | - | - | $3,351 | 450 | - | - |
- - kWh |
- - kW-months/year |
$3,351 450 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,330 Cost: $6,230 |
- | - | - | - | - | - | $2,330 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,330 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $433 Cost: $3,100 |
$277 | 7,670 | $156 | 9 | - | - | - | - |
$277 7,670 kWh |
$156 9 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $60,007 Cost: $177,780 |
$277 | 7,670 | $156 | 9 | $27,951 | 3,754 | $31,623 | - | $277 7,670 kWh |
$156 9 kW-months/year |
$27,951 3,754 MMBtu |
$31,623 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,951 Cost: $137,550 |
- | - | - | - | $27,951 | 3,754 | - | - | - - kWh |
- - kW-months/year |
$27,951 3,754 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |