IAC logo
IAC Assessment: UU0219
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0219
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2023
Principal Product Rubber
NAICS 326220 - Rubber and Plastics Hoses and Belting Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 180,000
Annual Production 130 Tons
Production Hrs. Annual 8,400
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,704 5,210,100 kWh $0.03
Electricity Demand $262,465 14,974 kW-months/year $17.53
Electricity Fees $54,172 - $ -
Natural Gas $248,965 61,469 MMBtu $4.05
TOTAL ENERGY COSTS $740,307
RECOMMENDED SAVINGS* $265,930 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,112
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$242,311
Cost:
$1,768,555
$167,706 4,932,540 $300,885 17,166 $95,827 23,661 $(-322,107) - $167,706
4,932,540
kWh
$300,885
17,166
kW-months/year
$95,827
23,661
MMBtu
$(-322,107)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,112
Cost:
$13,345
$6,404 188,367 $10,708 611 - - - - $6,404
188,367
kWh
$10,708
611
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,350
Cost:
$2,350
$2,350 69,100 - - - - - - $2,350
69,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,850
Cost:
$18,236
$1,850 54,429 - - - - - - $1,850
54,429
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,272
Cost:
$172
$1,272 37,400 - - - - - - $1,272
37,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4145 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE Savings:
$1,035
Cost:
$729
$1,035 30,448 - - - - - - $1,035
30,448
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$265,930
Cost:
$1,803,387
$180,617 5,312,284 $311,593 17,777 $95,827 23,661 $(-322,107) - $180,617
5,312,284
kWh
$311,593
17,777
kW-months/year
$95,827
23,661
MMBtu
$(-322,107)
-
$
TOTAL IMPLEMENTED Savings:
$17,112
Cost:
$13,345
$6,404 188,367 $10,708 611 - - - - $6,404
188,367
kWh
$10,708
611
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost