IAC Assessment: UU0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2023
Principal Product Nutrition supplement
NAICS 325411 - Medicinal and Botanical Manufacturing
SIC 2833 - Medicinals And Botanicals
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 196,000
Annual Production 800,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,899 884,788 kWh $0.04
Electricity Demand $45,339 3,590 kW-months/year $12.63
Natural Gas $34,878 3,247 MMBtu $10.74
TOTAL ENERGY COSTS $117,116
RECOMMENDED SAVINGS* $48,791 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,020
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$27,210
Cost:
$12,350
- - - - - - $27,210 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$27,210
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,523
Cost:
$21,923
$2,732 65,044 $3,791 300 - - - - $2,732
65,044
kWh
$3,791
300
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,221
Cost:
$11,385
- - - - $6,221 579 - - -
-
kWh
-
-
kW-months/year
$6,221
579
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,675
Cost:
$25,694
$4,020 95,706 $1,656 131 - - - - $4,020
95,706
kWh
$1,656
131
kW-months/year
-
-
MMBtu
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,589
Cost:
$4,500
- - - - - - $2,589 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,589
-
$
06: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$293
Cost:
$1,410
$190 4,524 $103 8 - - - - $190
4,524
kWh
$103
8
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$280
Cost:
$965
$73 1,742 $207 16 - - - - $73
1,742
kWh
$207
16
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$48,791
Cost:
$78,227
$7,015 167,016 $5,757 456 $6,221 579 $29,799 - $7,015
167,016
kWh
$5,757
456
kW-months/year
$6,221
579
MMBtu
$29,799
-
$
TOTAL IMPLEMENTED Savings:
$36,020
Cost:
$28,235
- - - - $6,221 579 $29,799 - -
-
kWh
-
-
kW-months/year
$6,221
579
MMBtu
$29,799
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes