IAC logo
IAC Assessment: UU0239
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0239
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product Cookies and crackers
NAICS 311821 - Cookie and Cracker Manufacturing
SIC 2052 - Cookies And Crackers
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 375,000
Annual Production 70,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $648,934 19,483,200 kWh $0.03
Electricity Demand $670,133 35,111 kW-months/year $19.09
Natural Gas $735,422 139,600 MMBtu $5.27
TOTAL ENERGY COSTS $2,054,489
RECOMMENDED SAVINGS* $61,472 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,411
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$21,184
Cost:
$8,000
- - - - $21,184 - - - -
-
kWh
-
-
kW-months/year
$21,184
-
$
-
-
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$18,178
Cost:
$2,000
$10,183 305,700 $7,995 419 - - - - $10,183
305,700
kWh
$7,995
419
kW-months/year
-
-
$
-
-
MMBtu
03: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$9,905
Cost:
$9,905
$5,549 166,573 $4,356 228 - - - - $5,549
166,573
kWh
$4,356
228
kW-months/year
-
-
$
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,144
Cost:
$7,887
- - - - - - $6,144 1,166 -
-
kWh
-
-
kW-months/year
-
-
$
$6,144
1,166
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,050
Cost:
$1,400
- - - - - - $3,050 579 -
-
kWh
-
-
kW-months/year
-
-
$
$3,050
579
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,011
Cost:
$3,011
$1,687 50,604 $1,324 69 - - - - $1,687
50,604
kWh
$1,324
69
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$61,472
Cost:
$32,203
$17,419 522,877 $13,675 716 $21,184 - $9,194 1,745 $17,419
522,877
kWh
$13,675
716
kW-months/year
$21,184
-
$
$9,194
1,745
MMBtu
TOTAL IMPLEMENTED Savings:
$55,411
Cost:
$27,792
$15,732 472,273 $12,351 647 $21,184 - $6,144 1,166 $15,732
472,273
kWh
$12,351
647
kW-months/year
$21,184
-
$
$6,144
1,166
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas