IAC logo
IAC Assessment: UU0256
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0256
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product Zirconium and Hafnium
NAICS 331410 - Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3339 - Primary Nonferrous Metals, Nec
Sales $100,000,000-$500,000,000
# of Employees 150
Plant Area (Sq.Ft.) 25,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 8,476
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $322,223 8,901,187 kWh $0.04
Electricity Demand $232,825 14,880 kW-months/year $15.65
Natural Gas $699,939 144,915 MMBtu $4.83
TOTAL ENERGY COSTS $1,254,987
RECOMMENDED SAVINGS* $71,266 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$43,875
Cost:
$401,481
$26,723 738,216 $17,152 1,096 - - - - $26,723
738,216
kWh
$17,152
1,096
kW-months/year
-
-
$
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,319
Cost:
$31,625
- - - - $14,319 - - - -
-
kWh
-
-
kW-months/year
$14,319
-
$
-
-
MMBtu
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$8,048
Cost:
$11,730
- - - - - - $8,048 1,666 -
-
kWh
-
-
kW-months/year
-
-
$
$8,048
1,666
MMBtu
04: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$5,024
Cost:
$7,960
- - - - - - $5,024 1,040 -
-
kWh
-
-
kW-months/year
-
-
$
$5,024
1,040
MMBtu
TOTAL RECOMMENDED Savings:
$71,266
Cost:
$452,796
$26,723 738,216 $17,152 1,096 $14,319 - $13,072 2,706 $26,723
738,216
kWh
$17,152
1,096
kW-months/year
$14,319
-
$
$13,072
2,706
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas