IAC Assessment: UU0261
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0261
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product Aerospace Engineering and Manufacturing
NAICS 336411 - Aircraft Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 186
Plant Area (Sq.Ft.) 135,000
Annual Production 840 Units
Production Hrs. Annual 4,700
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,499 1,740,600 kWh $0.04
Electricity Demand $89,423 5,504 kW-months/year $16.25
Electricity Fees $30,539 - $ -
Natural Gas $46,454 3,718 MMBtu $12.49
TOTAL ENERGY COSTS $228,915
RECOMMENDED SAVINGS* $40,837 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$22,296
Cost:
$572,100
$17,558 489,000 $4,738 292 - - $17,558
489,000
kWh
$4,738
292
kW-months/year
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,592
Cost:
$37,200
$2,417 67,300 $175 11 - - $2,417
67,300
kWh
$175
11
kW-months/year
-
-
$
03: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$12,100
Cost:
$21,600
- - - - $12,100 - -
-
kWh
-
-
kW-months/year
$12,100
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,063
Cost:
$9,140
$952 26,500 $1,111 68 - - $952
26,500
kWh
$1,111
68
kW-months/year
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,386
Cost:
$8,280
$255 7,100 $1,131 70 - - $255
7,100
kWh
$1,131
70
kW-months/year
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$400
Cost:
$5,940
$205 5,700 $195 12 - - $205
5,700
kWh
$195
12
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$40,837
Cost:
$654,260
$21,387 595,600 $7,350 452 $12,100 - $21,387
595,600
kWh
$7,350
452
kW-months/year
$12,100
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes