IAC logo
IAC Assessment: UU0263
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0263
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2025
Principal Product Surface Finishing
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 59,000
Annual Production 1,343 Thousand Feet
Production Hrs. Annual 4,832
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,420 658,320 kWh $0.04
Electricity Demand $47,093 2,914 kW-months/year $16.16
Electricity Fees $11,287 - $ -
Natural Gas $79,768 7,072 MMBtu $11.28
Fuel Oil #2 $71,966 2,692 MMBtu $26.74
Other Gas $6,118 1 MMBtu $6,117.52
TOTAL ENERGY COSTS $239,652
RECOMMENDED SAVINGS* $79,661 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$7,583
Cost:
$46,630
$630 17,510 $617 38 - - $6,336 237 - - $630
17,510
kWh
$617
38
kW-months/year
-
-
MMBtu
$6,336
237
MMBtu
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$7,105
Cost:
$5,100
- - - - $7,105 630 - - - - -
-
kWh
-
-
kW-months/year
$7,105
630
MMBtu
-
-
MMBtu
-
-
$
03: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,365
Cost:
$1,730
- - - - $1,365 121 - - - - -
-
kWh
-
-
kW-months/year
$1,365
121
MMBtu
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,805
Cost:
$8,150
- - - - $1,805 160 - - - - -
-
kWh
-
-
kW-months/year
$1,805
160
MMBtu
-
-
MMBtu
-
-
$
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$3,948
Cost:
$2,110
- - - - $3,948 350 - - - - -
-
kWh
-
-
kW-months/year
$3,948
350
MMBtu
-
-
MMBtu
-
-
$
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$4,840
Cost:
$11,200
- - - - - - - - $4,840 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$4,840
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,270
Cost:
$7,380
$5,270 148,090 - - - - - - - - $5,270
148,090
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$945
Cost:
$3,580
$591 16,600 $354 22 - - - - - - $591
16,600
kWh
$354
22
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,940
Cost:
$9,000
- - - - - - - - $3,940 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$3,940
-
$
10: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,860
Cost:
$1,500
- - - - - - - - $1,860 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,860
-
$
11: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$8,090
Cost:
$5,000
- - - - - - - - $8,090 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$8,090
-
$
12: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$32,910
Cost:
$158,576
$(-14,310) (-402,100) $(-41,510) (-2,569) - - $50,330 1,884 $38,400 - $(-14,310)
(-402,100)
kWh
$(-41,510)
(-2,569)
kW-months/year
-
-
MMBtu
$50,330
1,884
MMBtu
$38,400
-
$
TOTAL RECOMMENDED Savings:
$79,661
Cost:
$259,956
$(-7,819) (-219,900) $(-40,539) (-2,509) $14,223 1,261 $56,666 2,121 $57,130 - $(-7,819)
(-219,900)
kWh
$(-40,539)
(-2,509)
kW-months/year
$14,223
1,261
MMBtu
$56,666
2,121
MMBtu
$57,130
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes