IAC logo
IAC Assessment: UU0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2025
Principal Product structural metal bridge supports
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 110,000
Annual Production 320 Units
Production Hrs. Annual 4,800
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,659 2,363,120 kWh $0.04
Electricity Demand $142,813 8,790 kW-months/year $16.25
Electricity Fees $60,268 - $ -
Natural Gas $47,910 3,856 MMBtu $12.42
LPG $180,955 8,234 MMBtu $21.98
TOTAL ENERGY COSTS $516,605
RECOMMENDED SAVINGS* $107,112 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$15,681
Cost:
$22,500
- - - - $(-81,976) (-6,595) $97,657 4,447 - - -
-
kWh
-
-
kW-months/year
$(-81,976)
(-6,595)
MMBtu
$97,657
4,447
MMBtu
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$8,217
Cost:
$13,000
- - - - $(-2,643) (-213) $10,860 494 - - -
-
kWh
-
-
kW-months/year
$(-2,643)
(-213)
MMBtu
$10,860
494
MMBtu
-
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$52,801
Cost:
$18,500
$(-24) (-670) - - - - $65,158 2,965 $(-12,333) - $(-24)
(-670)
kWh
-
-
kW-months/year
-
-
MMBtu
$65,158
2,965
MMBtu
$(-12,333)
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$15,500
Cost:
$38,200
$7,500 208,500 $8,000 492 - - - - - - $7,500
208,500
kWh
$8,000
492
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,730
Cost:
$6,960
$5,730 160,190 - - - - - - - - $5,730
160,190
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$633
Cost:
$543
$633 17,690 - - - - - - - - $633
17,690
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,550
Cost:
$22,000
- - $8,550 526 - - - - - - -
-
kWh
$8,550
526
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$107,112
Cost:
$121,703
$13,839 385,710 $16,550 1,018 $(-84,619) (-6,808) $173,675 7,907 $(-12,333) - $13,839
385,710
kWh
$16,550
1,018
kW-months/year
$(-84,619)
(-6,808)
MMBtu
$173,675
7,907
MMBtu
$(-12,333)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes