IAC logo
IAC Assessment: UU0272
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0272
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2025
Principal Product Petroleum products
NAICS 324110 - Petroleum Refineries
SIC 2911 - Petroleum Refining
Sales $10,000,000-$50,000,000
# of Employees 20
Plant Area (Sq.Ft.) 1,311,000
Annual Production 162,500 Units
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,063 1,595,700 kWh $0.05
Electricity Demand $47,749 3,917 kW-months/year $12.19
Electricity Fees $21,807 - $ -
Fuel Oil #4 $1,236,778 130,794 MMBtu $9.46
TOTAL ENERGY COSTS $1,383,397
RECOMMENDED SAVINGS* $272,260 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #4 Personnel Changes Electricity Usage Electricity Demand Electricity Fees Fuel Oil #4 Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8124 Hire Energy Manager Savings:
$66,000
Cost:
$13,000
$6,900 144,000 - - - - $111,100 11,800 $(-52,000) - $6,900
144,000
kWh
-
-
kW-months/year
-
-
$
$111,100
11,800
MMBtu
$(-52,000)
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$31,500
Cost:
$18,800
- - - - - - $31,500 3,330 - - -
-
kWh
-
-
kW-months/year
-
-
$
$31,500
3,330
MMBtu
-
-
$
03: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$20,800
Cost:
$16,300
- - - - - - $20,800 2,200 - - -
-
kWh
-
-
kW-months/year
-
-
$
$20,800
2,200
MMBtu
-
-
$
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$54,700
Cost:
$110,000
- - - - - - $54,700 5,780 - - -
-
kWh
-
-
kW-months/year
-
-
$
$54,700
5,780
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,950
Cost:
$23,600
$7,390 154,000 $2,560 210 - - - - - - $7,390
154,000
kWh
$2,560
210
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,170
Cost:
$26,600
$3,090 64,400 $1,080 89 - - - - - - $3,090
64,400
kWh
$1,080
89
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$62,900
Cost:
$32,400
- - - - - - $62,900 6,650 - - -
-
kWh
-
-
kW-months/year
-
-
$
$62,900
6,650
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$890
Cost:
$410
$656 13,600 $234 19 - - - - - - $656
13,600
kWh
$234
19
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$18,600
Cost:
$207,000
$18,600 387,000 - - - - - - - - $18,600
387,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,500
Cost:
$600
- - - - $1,500 - - - - - -
-
kWh
-
-
kW-months/year
$1,500
-
$
-
-
MMBtu
-
-
$
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,250
Cost:
$11,200
- - - - $1,250 - - - - - -
-
kWh
-
-
kW-months/year
$1,250
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$272,260
Cost:
$459,910
$36,636 763,000 $3,874 318 $2,750 - $281,000 29,760 $(-52,000) - $36,636
763,000
kWh
$3,874
318
kW-months/year
$2,750
-
$
$281,000
29,760
MMBtu
$(-52,000)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #4 Personnel Changes Electricity Usage Electricity Demand Electricity Fees Fuel Oil #4 Personnel Changes