Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2025 |
Principal Product | Oatbase |
NAICS | 311511 - Fluid Milk Manufacturing |
SIC | 2023 - Dry, Condensed, Evaporated Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 26 |
Plant Area (Sq.Ft.) | 14,000 |
Annual Production | 15,850 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $118,850 | 3,163,200 | kWh | $0.04 |
Electricity Demand | $165,170 | 12,600 | kW-months/year | $13.11 |
Natural Gas | $302,790 | 37,474 | MMBtu | $8.08 |
TOTAL ENERGY COSTS | $586,810 | |||
RECOMMENDED SAVINGS* | $278,890 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $92,200 Cost: $14,000 |
- | - | - | - | - | - | - | - | - | - | $92,200 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
$92,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $119,920 Cost: $620,000 |
$(-19,170) | (-518,000) | $(-17,430) | (-1,339) | $(-13,200) | - | $169,720 | 21,010 | - | - | - | - |
$(-19,170) (-518,000) kWh |
$(-17,430) (-1,339) kW-months/year |
$(-13,200) - $ |
$169,720 21,010 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $5,400 Cost: $15,580 |
- | - | - | - | - | - | $5,400 | 668 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$5,400 668 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $8,900 Cost: $4,720 |
- | - | - | - | - | - | $11,720 | 1,450 | $(-2,820) | (-969) | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$11,720 1,450 MMBtu |
$(-2,820) (-969) Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,050 Cost: $2,860 |
- | - | - | - | - | - | $1,050 | 130 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$1,050 130 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,760 Cost: $1,400 |
$1,760 | 47,500 | - | - | - | - | - | - | - | - | - | - |
$1,760 47,500 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $49,660 Cost: $460,010 |
$40,980 | 1,107,644 | $8,680 | 666 | - | - | - | - | - | - | - | - |
$40,980 1,107,644 kWh |
$8,680 666 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $278,890 Cost: $1,118,570 |
$23,570 | 637,144 | $(-8,750) | (-673) | $(-13,200) | - | $187,890 | 23,258 | $(-2,820) | (-969) | $92,200 | - | $23,570 637,144 kWh |
$(-8,750) (-673) kW-months/year |
$(-13,200) - $ |
$187,890 23,258 MMBtu |
$(-2,820) (-969) Tgal |
$92,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Usage | Administrative Changes |