Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Washington |
---|---|
Assessment Year | 2007 |
Principal Product | Cockpit lighting and instrumentation panels |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 162 |
Plant Area (Sq.Ft.) | 31,000 |
Annual Production | 1 Units |
Production Hrs. Annual | 5,720 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $71,612 | 1,173,960 | kWh | $0.06 |
Electricity Demand | $20,402 | 3,264 | kW-months/year | $6.25 |
Electricity Fees | $1,423 | - | $ | - |
Natural Gas | $76,191 | 6,383 | MMBtu | $11.94 |
TOTAL ENERGY COSTS | $172,808 | |||
RECOMMENDED SAVINGS* | $16,493 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,385 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $7,385 Cost: $50,000 |
$6,985 | 114,516 | - | - | - | - | $400 | - | - | - |
$6,985 114,516 kWh |
- - kW-months/year |
- - MMBtu |
$400 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $929 Cost: $2,100 |
$1,835 | 30,077 | $394 | 63 | - | - | $(-1,300) | - | - | - |
$1,835 30,077 kWh |
$394 63 kW-months/year |
- - MMBtu |
$(-1,300) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $5,723 Cost: $20,750 |
$473 | 7,750 | - | - | $750 | 62 | $(-500) | - | $5,000 | - |
$473 7,750 kWh |
- - kW-months/year |
$750 62 MMBtu |
$(-500) - $ |
$5,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $1,551 Cost: $7,020 |
- | - | - | - | $1,551 | 128 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,551 128 MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $905 Cost: $1,200 |
$905 | 14,833 | - | - | - | - | - | - | - | - |
$905 14,833 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $16,493 Cost: $81,070 |
$10,198 | 167,176 | $394 | 63 | $2,301 | 190 | $(-1,400) | - | $5,000 | - | $10,198 167,176 kWh |
$394 63 kW-months/year |
$2,301 190 MMBtu |
$(-1,400) - $ |
$5,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,385 Cost: $10,320 |
$2,740 | 44,910 | $394 | 63 | $1,551 | 128 | $(-1,300) | - | - | - | $2,740 44,910 kWh |
$394 63 kW-months/year |
$1,551 128 MMBtu |
$(-1,300) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Increase in Production |