IAC logo
IAC Assessment: UW0010
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: UW0010
IAC Center University of Washington
Assessment Year 2008
Principal Product Vinyl windows and patio doors, aluminum windows and patio doors
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 129,600
Annual Production 1 Units
Production Hrs. Annual 6,240
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,752 3,182,600 kWh $0.03
Electricity Demand $47,820 8,064 kW-months/year $5.93
Electricity Fees $1,358 - $ -
Natural Gas $10,229 800 MMBtu $12.79
TOTAL ENERGY COSTS $227,683
RECOMMENDED SAVINGS* $26,846 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,108
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,108
Cost:
$4,160
$10,553 311,710 $3,555 599 - - - - $10,553
311,710
kWh
$3,555
599
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$7,398
Cost:
$75,533
- - - - $7,398 709 - - -
-
kWh
-
-
kW-months/year
$7,398
709
MMBtu
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$5,340
Cost:
$3,000
$2,640 78,000 - - - - $2,700 - $2,640
78,000
kWh
-
-
kW-months/year
-
-
MMBtu
$2,700
-
$
TOTAL RECOMMENDED Savings:
$26,846
Cost:
$82,693
$13,193 389,710 $3,555 599 $7,398 709 $2,700 - $13,193
389,710
kWh
$3,555
599
kW-months/year
$7,398
709
MMBtu
$2,700
-
$
TOTAL IMPLEMENTED Savings:
$14,108
Cost:
$4,160
$10,553 311,710 $3,555 599 - - - - $10,553
311,710
kWh
$3,555
599
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes