IAC Assessment: UW0016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW0016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2008
Principal Product Tofu and Tofu Products
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $1,000,000-$5,000,000
# of Employees 22
Plant Area (Sq.Ft.) 10,000
Annual Production 540,000 Pounds
Production Hrs. Annual 3,510
Location (State) HI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,635 73,415 kWh $0.20
Electricity Demand $1,718 300 kW-months/year $5.73
Natural Gas $82,543 2,419 MMBtu $34.12
TOTAL ENERGY COSTS $161,084
RECOMMENDED SAVINGS* $63,155 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,263
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$29,638
Cost:
-
- - - - $29,638 - - - -
-
kWh
-
-
kW-months/year
$29,638
-
MMBtu
-
-
Tgal
02: 2.1224 REPLACE BOILER Savings:
$10,000
Cost:
$20,000
- - - - $10,000 1,001 - - -
-
kWh
-
-
kW-months/year
$10,000
1,001
MMBtu
-
-
Tgal
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$5,490
Cost:
$5,600
- - - - $5,490 700 - - -
-
kWh
-
-
kW-months/year
$5,490
700
MMBtu
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,000
Cost:
$500
- - - - $7,000 548 - - -
-
kWh
-
-
kW-months/year
$7,000
548
MMBtu
-
-
Tgal
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$4,625
Cost:
$8,550
$4,608 24,255 $17 3 - - - - $4,608
24,255
kWh
$17
3
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$5,510
Cost:
$10
- - - - - - $5,510 631,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,510
631,000
Tgal
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$892
Cost:
-
$808 4,255 $84 15 - - - - $808
4,255
kWh
$84
15
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$63,155
Cost:
$34,660
$5,416 28,510 $101 18 $52,128 2,249 $5,510 631,000 $5,416
28,510
kWh
$101
18
kW-months/year
$52,128
2,249
MMBtu
$5,510
631,000
Tgal
TOTAL IMPLEMENTED Savings:
$41,263
Cost:
$9,050
$4,608 24,255 $17 3 $36,638 548 - - $4,608
24,255
kWh
$17
3
kW-months/year
$36,638
548
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal