Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2008
Principal Product Metal Tubing
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 78,000
Annual Production 50,000 Pieces
Production Hrs. Annual 7,176
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,052 1,386,600 kWh $0.06
Electricity Demand $26,682 3,853 kW-months/year $6.92
Electricity Fees $2,216 - $ -
Natural Gas $121,586 11,555 MMBtu $10.52
TOTAL ENERGY COSTS $238,536
RECOMMENDED SAVINGS* $49,608 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,074
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.1224 REPLACE BOILER Savings:
$16,074
Cost:
$25,870
- - - - $16,074 1,657 - - -
-
kWh
-
-
kW-months/year
$16,074
1,657
MMBtu
-
-
Tgal
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$15,042
Cost:
$2,500
- - - - $15,042 1,551 - - -
-
kWh
-
-
kW-months/year
$15,042
1,551
MMBtu
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$14,046
Cost:
$2,908
- - - - $12,230 1,259 $1,816 127,160 -
-
kWh
-
-
kW-months/year
$12,230
1,259
MMBtu
$1,816
127,160
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,446
Cost:
$2,439
$3,822 63,261 $624 90 - - - - $3,822
63,261
kWh
$624
90
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$49,608
Cost:
$33,717
$3,822 63,261 $624 90 $43,346 4,467 $1,816 127,160 $3,822
63,261
kWh
$624
90
kW-months/year
$43,346
4,467
MMBtu
$1,816
127,160
Tgal
TOTAL IMPLEMENTED Savings:
$16,074
Cost:
$25,870
- - - - $16,074 1,657 - - -
-
kWh
-
-
kW-months/year
$16,074
1,657
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal