Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Washington |
---|---|
Assessment Year | 2008 |
Principal Product | Baked Goods |
NAICS | 311811 - Retail Bakeries |
SIC | 5461 - Retail Bakeries |
Sales | <$500,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 5,000,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $318,017 | 6,482,887 | kWh | $0.05 |
Electricity Demand | $7,736 | 12,210 | kW-months/year | $0.63 |
Electricity Fees | $3,206 | - | $ | - |
Natural Gas | $975,211 | 90,404 | MMBtu | $10.79 |
TOTAL ENERGY COSTS | $1,304,170 | |||
RECOMMENDED SAVINGS* | $91,628 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $52,486 Cost: $175,000 |
- | - | - | - | - | - | $52,486 | 4,447 |
- - kWh |
- - kW-months/year |
- - $ |
$52,486 4,447 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $20,223 Cost: $49,000 |
- | - | - | - | - | - | $20,223 | 1,713 |
- - kWh |
- - kW-months/year |
- - $ |
$20,223 1,713 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,357 Cost: $5,912 |
$9,346 | 186,921 | $11 | 1 | - | - | - | - |
$9,346 186,921 kWh |
$11 1 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $5,612 Cost: $50,000 |
$5,492 | 109,844 | $120 | 12 | - | - | - | - |
$5,492 109,844 kWh |
$120 12 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,472 Cost: - |
$3,398 | 67,963 | - | - | $74 | - | - | - |
$3,398 67,963 kWh |
- - kW-months/year |
$74 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $478 Cost: $450 |
$478 | 9,560 | - | - | - | - | - | - |
$478 9,560 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $91,628 Cost: $280,362 |
$18,714 | 374,288 | $131 | 13 | $74 | - | $72,709 | 6,160 | $18,714 374,288 kWh |
$131 13 kW-months/year |
$74 - $ |
$72,709 6,160 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |