IAC Assessment: UW2307
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2307
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2023
Principal Product Precision sheet metal manufacturing, stamping and fabrication
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 48
Plant Area (Sq.Ft.) 30,000
Annual Production 40,000 Pounds
Production Hrs. Annual 4,940
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,724 963,360 kWh $0.12
TOTAL ENERGY COSTS $115,724
RECOMMENDED SAVINGS* $958,225 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $879,050
#|Description Savings
Cost
Status Electricity Usage Increase in Production Electricity Usage Increase in Production
$ kWh $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,807
Cost:
$2,080
$1,807 15,047 - - $1,807
15,047
kWh
-
-
%
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,660
Cost:
-
$1,660 13,820 - - $1,660
13,820
kWh
-
-
%
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$557
Cost:
$1,253
$557 4,649 - - $557
4,649
kWh
-
-
%
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$75,708
Cost:
$310,796
$75,708 630,371 - - $75,708
630,371
kWh
-
-
%
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$878,493
Cost:
$1,900,000
$4,493 37,440 $874,000 - $4,493
37,440
kWh
$874,000
-
%
TOTAL RECOMMENDED Savings:
$958,225
Cost:
$2,214,129
$84,225 701,327 $874,000 - $84,225
701,327
kWh
$874,000
-
%
TOTAL IMPLEMENTED Savings:
$879,050
Cost:
$1,901,253
$5,050 42,089 $874,000 - $5,050
42,089
kWh
$874,000
-
%
Savings
Cost
$ kWh $ %
Electricity Usage Increase in Production Electricity Usage Increase in Production