IAC Assessment: UW2319
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2319
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2023
Principal Product resin, fiberglass, carbon fiber
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 127,500
Annual Production 3,000 Units
Production Hrs. Annual 7,722
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,365 3,617,400 kWh $0.08
Electricity Demand $108,360 17,665 kW-months/year $6.13
Electricity Fees $60,444 - $ -
Natural Gas $80,548 6,485 MMBtu $12.42
TOTAL ENERGY COSTS $541,717
RECOMMENDED SAVINGS* $843,540 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$56,470
Cost:
$23,651
$52,344 451,241 $3,794 618 $332 27 - - $52,344
451,241
kWh
$3,794
618
kW-months/year
$332
27
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,837
Cost:
$2,080
$17,402 150,015 $1,435 234 - - - - $17,402
150,015
kWh
$1,435
234
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,001
Cost:
$2,820
- - - - $1,001 81 - - -
-
kWh
-
-
kW-months/year
$1,001
81
MMBtu
-
-
$
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$11,443
Cost:
$68,000
$10,670 91,980 $773 126 - - - - $10,670
91,980
kWh
$773
126
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,789
Cost:
$3,000
$5,348 46,106 $441 72 - - - - $5,348
46,106
kWh
$441
72
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3142 USER BATTERY STORAGE FOR POWER QUALITY ISSUES Savings:
$750,000
Cost:
$871,000
- - - - - - $750,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$750,000
-
$
TOTAL RECOMMENDED Savings:
$843,540
Cost:
$970,551
$85,764 739,342 $6,443 1,050 $1,333 107 $750,000 - $85,764
739,342
kWh
$6,443
1,050
kW-months/year
$1,333
107
MMBtu
$750,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product