IAC Assessment: UW2401
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2401
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2024
Principal Product Other Aircraft Parts and Auxiliary Equipment Manufacturing
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 131
Plant Area (Sq.Ft.) 61,000
Annual Production 950,000 Units
Production Hrs. Annual 8,568
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $300,101 4,322,533 kWh $0.07
Electricity Demand $51,855 8,466 kW-months/year $6.13
Electricity Fees $18,013 - $ -
Natural Gas $636,069 96,856 MMBtu $6.57
TOTAL ENERGY COSTS $1,006,038
RECOMMENDED SAVINGS* $184,395 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$141,044
Cost:
$149,500
$44,998 648,380 - - $96,046 14,625 $44,998
648,380
kWh
-
-
kW-months/year
$96,046
14,625
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,688
Cost:
$3,000
$1,502 21,638 $186 30 - - $1,502
21,638
kWh
$186
30
kW-months/year
-
-
MMBtu
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,711
Cost:
$4,441
$(-1,384) (-19,940) $(-436) (-71) $3,531 538 $(-1,384)
(-19,940)
kWh
$(-436)
(-71)
kW-months/year
$3,531
538
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,204
Cost:
$23,347
- - $6,204 721 - - -
-
kWh
$6,204
721
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,098
Cost:
$26,080
$6,317 91,035 $781 128 - - $6,317
91,035
kWh
$781
128
kW-months/year
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$26,650
Cost:
$58,013
- - - - $26,650 4,058 -
-
kWh
-
-
kW-months/year
$26,650
4,058
MMBtu
TOTAL RECOMMENDED Savings:
$184,395
Cost:
$264,381
$51,433 741,113 $6,735 808 $126,227 19,221 $51,433
741,113
kWh
$6,735
808
kW-months/year
$126,227
19,221
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas