IAC logo
IAC Assessment: UW2407
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2407
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2024
Principal Product Guided Missile and Space Vehicle Manufacturing
NAICS 336414 - Guided Missile and Space Vehicle Manufacturing
SIC 3761 - Guided Missiles And Space Vehicles
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 152,000
Annual Production 5,000 Pieces
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $889,456 8,503,400 kWh $0.10
Electricity Demand $61,098 11,930 kW-months/year $5.12
Natural Gas $9,371 702 MMBtu $13.35
TOTAL ENERGY COSTS $959,925
RECOMMENDED SAVINGS* $380,089 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Increase in Production Electricity Usage Electricity Demand Increase in Production
$ kWh $ kW-months/year $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$69,227
Cost:
$25,000
$64,874 620,208 $4,353 850 - - $64,874
620,208
kWh
$4,353
850
kW-months/year
-
-
%
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$90,353
Cost:
$650,364
$90,353 863,794 - - - - $90,353
863,794
kWh
-
-
kW-months/year
-
-
%
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$207,284
Cost:
$100
$194,255 1,857,120 $13,029 2,544 - - $194,255
1,857,120
kWh
$13,029
2,544
kW-months/year
-
-
%
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$7,000
Cost:
$9,000
- - - - $7,000 - -
-
kWh
-
-
kW-months/year
$7,000
-
%
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,085
Cost:
$28,384
$2,085 18,615 - - - - $2,085
18,615
kWh
-
-
kW-months/year
-
-
%
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,140
Cost:
$14,800
$4,140 39,579 - - - - $4,140
39,579
kWh
-
-
kW-months/year
-
-
%
TOTAL RECOMMENDED Savings:
$380,089
Cost:
$727,648
$355,707 3,399,316 $17,382 3,394 $7,000 - $355,707
3,399,316
kWh
$17,382
3,394
kW-months/year
$7,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ %
Electricity Usage Electricity Demand Increase in Production Electricity Usage Electricity Demand Increase in Production