Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Washington |
---|---|
Assessment Year | 2024 |
Principal Product | Guided Missile and Space Vehicle Manufacturing |
NAICS | 336414 - Guided Missile and Space Vehicle Manufacturing |
SIC | 3761 - Guided Missiles And Space Vehicles |
Sales | $100,000,000-$500,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 152,000 |
Annual Production | 5,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $889,456 | 8,503,400 | kWh | $0.10 |
Electricity Demand | $61,098 | 11,930 | kW-months/year | $5.12 |
Natural Gas | $9,371 | 702 | MMBtu | $13.35 |
TOTAL ENERGY COSTS | $959,925 | |||
RECOMMENDED SAVINGS* | $380,089 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Increase in Production | Electricity Usage | Electricity Demand | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $69,227 Cost: $25,000 |
$64,874 | 620,208 | $4,353 | 850 | - | - |
$64,874 620,208 kWh |
$4,353 850 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $90,353 Cost: $650,364 |
$90,353 | 863,794 | - | - | - | - |
$90,353 863,794 kWh |
- - kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $207,284 Cost: $100 |
$194,255 | 1,857,120 | $13,029 | 2,544 | - | - |
$194,255 1,857,120 kWh |
$13,029 2,544 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $7,000 Cost: $9,000 |
- | - | - | - | $7,000 | - |
- - kWh |
- - kW-months/year |
$7,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,085 Cost: $28,384 |
$2,085 | 18,615 | - | - | - | - |
$2,085 18,615 kWh |
- - kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $4,140 Cost: $14,800 |
$4,140 | 39,579 | - | - | - | - |
$4,140 39,579 kWh |
- - kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $380,089 Cost: $727,648 |
$355,707 | 3,399,316 | $17,382 | 3,394 | $7,000 | - | $355,707 3,399,316 kWh |
$17,382 3,394 kW-months/year |
$7,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Increase in Production | Electricity Usage | Electricity Demand | Increase in Production |